Click on a photo to enlarge.
The Before Picture shows a Support Post that is failing.
The After Picture shows the New I Beam, and Smart Jacks, that Saber installed.
Drains and concrete in Escondido
The Before Picture shows the area that the Flagpole will Occupy. The Contractor had designated this spot.
The After Picture Shows the Anchored Helical Pier, that will keep the Flagpole Upright.
The Before picture shows cracks in the concrete slab surrounding a meter.
The After picture shows installed Push Piers that are strengthening the home's foundation. The cracks in the Before picture were caused by foundation settling.
The crawlspace support posts originally didnt have the seismic retrofit brackets that are shown in the after picture.